64 Maximum number of strand
jacks simultaneously in action per group;
groups can be connected (maximum number is
unlimited); |
 |
Operation is both possible
for individual jack as for a group of jacks
(synchronically); |
 |
Lifting and lowering operation
possible in different modes (automatic or
semi-manual):
| 1. |
prestress mode |
| 2. |
fast lifting/lowering
without load |
| 3. |
normal lifting/lowering
without load |
|
 |
Fast and easy manual intervention;
|
 |
All needed functions in heavy
lifting/lowering are available; |
 |
Well-organized presentation;
|
 |
Data logging from all data
for later reconstruction; |
 |
Error Presentation and storing;
|
 |
Several (I)PCs and/or
laptops on different locations can be used
for monitoring the lifting/lowering operation
in view mode or authorized intervention; |
 |
Control functions (for example
automatic levelling) |
 |
All parameters can be preset
per single strand jack (for example max pressure
jack, max pressure lock device. max workload,
alarm messages etc.) |
 |
Different type of strand jacks
used in one control unit is possible |
 |
Safety factor: 2,5 |
 |
Accuracy less than 0,5% |